Bheri Corridor Bridges Unfinished After Six Years: What Dolpa-Bound Trekkers Need to Know
Five Bheri Corridor bridges between Jajarkot and Dolpa remain unfinished nearly six years after contracts. What it means for autumn Dolpo trek plans.
Nepal NEWS
Five Bheri Corridor bridges between Jajarkot and Dolpa remain unfinished nearly six years after contracts. What it means for autumn Dolpo trek plans.
Flash flooding on the Bahula Khola in Jajarkot has cut the Bheri Corridor, the main road to Dolpa and Shey Phoksundo, stranding Dolpo-bound travellers.
Nepal’s Department of Roads is weighing twin tunnels or two bridges to permanently bypass the collapsed Krishnabhir section of the Prithvi Highway.
The Prithvi Highway is closed at Krishnabhir after a 70-metre stretch collapsed into the Trishuli. Here is what Kathmandu-Pokhara travellers need to know.
The first vehicles crossed the collapsed Krishnabhir stretch of the Prithvi Highway in a 13 September trial run. Two-way traffic is expected from 17 September.
Locals in Manang have blocked heavy vehicles on the Chame-Besisahar road, the gateway to the Annapurna Circuit, after monsoon damage. What trekkers need to know before travelling.
The Besisahar-Chame road is fully closed to all vehicles today for concreting at Dharapani, and heavy vehicles are banned until Sunday 10am. Annapurna Circuit trekker update.
From a Rs190 pottery workshop to a Rs500 folk-rock flood-relief fundraiser: five Kathmandu Valley events for the week of 12-18 September 2026.
A landslide dammed the Hunga Khola in Solukhumbu on Friday, threatening flash floods down the Dudh Koshi. What Everest-region trekkers need to know.
Chinakot, a 2,200 m palace hilltop in Myagdi, now has new trails, viewpoints and shelters with panoramas of Dhaulagiri and Annapurna. Here is how to reach it.